Material Coordination

Live MRP Against Confirmed Orders

HublerX runs material requirements planning continuously against confirmed sales orders, live stock positions, and inbound POs — so planners see the real material position now, not yesterday's overnight snapshot.

Live MRPMaterial planningConfirmed ordersSAPFoodFMCG
The Problem

MRP ran at midnight. By 8 AM the picture has already changed — and nobody knows.

Standard ERP MRP runs overnight as a batch process. By the time the planner opens the MRP report in the morning, the demand picture has already shifted — new sales orders have arrived, a batch has been put on quality hold, a supplier has confirmed a delay. The MRP output the planner is working from is 8–12 hours old before the first decision of the day is made.

The gap between the MRP snapshot and reality is where shortages hide. A material that looked covered at midnight may be short by 9 AM — because a new confirmed order consumed the projected stock, or because an inbound PO was rescheduled overnight. The planner finds out when the line stops, not when the gap opens.

Current Workaround
What most operations do today: Most operations today: planners run a manual MRP refresh in SAP mid-morning after checking their inbox for new orders and supplier updates. The refresh takes 20–40 minutes to process. By the time the output is available, more orders may have arrived. Planners maintain a parallel spreadsheet of known risks — materials they are watching — and check these manually throughout the day. The ERP MRP and the planner's spreadsheet are never fully in sync.
The HublerX Approach

MRP is a calculation, not a report — and calculations can run continuously. HublerX maintains a live material requirements position by reconciling confirmed sales orders, open work orders, current stock levels, and inbound PO commitments in real time. When any input changes — a new order arrives, a batch is held, a PO is rescheduled — the material position updates immediately and any new gap is surfaced to the planner before it becomes a stoppage.

How It Looks in HublerX

Live workflow view

Live MRP Board
14 materials tracked live
COVERED4
Wheat Flour — RM-0019WO-4441 · Line 2 · Due ThursdayCoveredStock: 4,200 kg · Need: 3,800 kg
Sugar — RM-0022WO-4443 · Line 1 · Due ThursdayCoveredStock: 2,100 kg · Need: 1,900 kg
Cocoa Powder — RM-0078WO-4447 · Line 3 · Due FridayCoveredPO-9011 arriving Wednesday · 800 kg
Salt — RM-0009WO-4449 · Line 2 · Due FridayCoveredStock: 980 kg · Need: 400 kg
WATCH4
Sunflower Oil — RM-0031WO-4453 · Line 1 · Due WednesdayWatchWatchPO-9014 ETA Wednesday AM · Tight
Milk Powder — RM-0067WO-4455 · Line 3 · Due WednesdayWatchWatchStock: 600 kg · Need: 550 kg · New order added
Glucose Syrup — RM-0055WO-4457 · Line 2 · Due ThursdayWatchWatchPO-9018 supplier confirmation pending
Palm Oil — RM-0041WO-4459 · Line 1 · Due FridayWatchCoverage tight if WO-4461 added to schedule
GAP OPEN3
Maida — RM-0088WO-4463 · Line 2 · Due TomorrowGap openHighNew SO-8851 consumed projected stock
Oat Flour — RM-0094WO-4465 · Line 1 · Due TomorrowGap openHighPO-9022 rescheduled by supplier · 2 days
RESOLVED3
Butter — RM-0051WO-4431 · Line 1 · Gap resolved MondayResolvedAlternate supplier approved · Delivered
Corn Starch — RM-0061WO-4433 · Line 2 · Gap resolved MondayResolvedWO rescheduled · No line impact
Cardamom — RM-0071WO-4435 · Line 3 · Gap resolved TuesdayResolvedPO expedited · Arrived this morning
How HublerX Coordinates It

The step-by-step sequence

  1. 1

    Confirmed orders pulled from ERP in real time

    HublerX reads confirmed sales orders from the ERP continuously — not as a scheduled batch. Every new order, every order revision, and every cancellation updates the demand picture immediately.

    Continuous · on every order event
  2. 2

    Live stock position reconciled

    Current stock levels — raw materials, WIP, and finished goods — are read from the ERP and WMS in real time. Batches on quality hold are excluded from available stock automatically. Stock consumed by running work orders is decremented as production progresses.

    Continuous · on every stock event
  3. 3

    Inbound PO commitments tracked

    Open purchase orders and their confirmed delivery dates are read from the ERP. Where a supplier has updated an ETA — via EDI, portal, or manual confirmation — the revised date is reflected in the material position immediately.

    Continuous · on every PO event
  4. 4

    Material gaps identified and ranked

    When the live MRP calculation identifies a gap — projected stock falling below the requirement for a confirmed work order — HublerX flags it immediately, ranked by production impact and days to breach. Gaps are visible to the planner the moment they open, not the next morning.

    On gap detection · real time
  5. 5

    Planner and procurement alerted simultaneously

    When a gap is detected, the production planner and the responsible buyer receive the alert at the same moment — with the material, the quantity short, the work order at risk, and the latest inbound PO status. No sequential phone chain. No gap between detection and response.

    Immediately on gap flag
  6. 6

    Gap resolved and position updated

    Once the gap is resolved — a PO is expedited, an alternate material is approved, or a work order is rescheduled — HublerX updates the material position and closes the alert. The live MRP position reflects the resolution immediately.

    On gap resolution
Systems Connected
SAPSAP S/4HANA
ORAOracle Cloud ERP
D365Dynamics 365
WMSWMS
SYSSupplier portal (optional)
Outcomes
Real time
MRP position updated on every demand and supply event — not an overnight batch run
Hours earlier
Material gaps can be surfaced before the line is affected — not when the warehouse finds empty shelves
Simultaneous
Planner and buyer alerted at the same moment — no sequential phone chain between functions
Live
Confirmed sales orders, open WOs, current stock, and inbound POs reconciled in one continuously updated position

Results are directional. Outcomes vary by ERP integration depth, supplier data quality, and production schedule complexity.

Frequently Asked Questions
Related Workflows

See how live MRP works in your operation

30 minutes. Your ERP. Your production schedule.

Map my Material Planning Gap →
Part of the Manufacturing Execution Gap framework