The planner sequences work orders by delivery date. The line loses 4 hours a day to changeovers that could have been half as long.
In food manufacturing, changeover time is not fixed — it depends on the sequence. Switching from a nut-containing product to a nut-free product on the same line requires a full allergen clean: 90 minutes. Switching from nut-free to nut-containing requires only a standard changeover: 20 minutes. The sequence determines the cleaning requirement, and the cleaning requirement determines how much of the shift is spent producing. A planner scheduling by delivery date alone — without accounting for changeover cost — can easily produce a sequence that requires three full allergen cleans in a shift that needed only one.
The lost time is invisible in the ERP. The schedule shows eight work orders. The line completes five. The gap between the plan and the output is recorded as downtime — but the root cause is a sequence that generated avoidable changeovers. The planner has no tool to evaluate the changeover cost of a sequence before the line starts. The only feedback is at shift end, when the output is already short.
Changeover cost is computable — every product-to-product transition has a known cleaning requirement and duration. HublerX holds the changeover matrix for each line: which transitions require allergen cleans, which require standard changeovers, and how long each takes. When building the production schedule, HublerX evaluates the changeover cost of each sequence option and generates the sequence that minimises total changeover time while respecting allergen rules, delivery priorities, and line capacity. The planner reviews and confirms; the schedule that reaches the shopfloor is already optimised.
Live workflow view
The step-by-step sequence
- 1
Work orders and priorities loaded
HublerX reads the open work orders for each line from the ERP — with quantities, due dates, and customer priority flags. The planning horizon is set by the planner: next shift, next day, or next week. Work orders are grouped by line based on product-line assignment.
On schedule generation · daily - 2
Changeover matrix applied
HublerX applies the changeover matrix for each line — the cleaning type and duration required for every product-to-product transition. Allergen transitions (nut to nut-free, gluten to gluten-free, dairy to dairy-free) are flagged separately and respected as hard constraints. Standard changeover times are applied as costs to be minimised.
On sequence optimisation - 3
Optimal sequence generated
HublerX generates the production sequence that minimises total changeover time across all work orders for the shift — grouping allergen families where possible, sequencing flavour and colour progressions in the low-to-high direction, and protecting delivery priority for time-critical orders. The total changeover cost of the recommended sequence is shown alongside the baseline delivery-date sequence for comparison.
On optimisation completion - 4
Planner reviews and adjusts
The planner reviews the recommended sequence on the HublerX scheduling board — with each work order, its quantity, its changeover requirement from the previous order, and the cleaning duration shown inline. The planner can adjust the sequence manually; the changeover cost recalculates in real time as orders are resequenced.
Planner review · pre-shift - 5
Schedule confirmed and published to shopfloor
The confirmed sequence is published to the line supervisor's view in HublerX — with each work order, its start time, its changeover type, and the cleaning protocol required. The line supervisor and QA team receive the allergen changeover requirements in advance, not when the line is already stopped.
On planner confirmation - 6
Changeover compliance tracked
As each changeover is completed on the line, the duration is recorded in HublerX against the planned duration. Where an allergen clean is required, QA sign-off is captured before the next work order starts. Changeover performance — actual vs planned — is visible to the planner throughout the shift.
Continuous · during shift
Results are directional. Changeover savings depend on product mix, allergen group distribution, and shift structure.