The audit is in 3 weeks. The quality team is working nights to get ready. This repeats every year.
Food and FMCG manufacturers that hold FSSC 22000, BRC, or retailer-specific quality certifications face annual or biannual surveillance audits. In the 4–6 weeks before an audit, the quality team enters emergency mode — reviewing the CAPA log for open items, chasing document reviews that are overdue, completing monitoring records that fell behind, and preparing the evidence packs that the auditor will request. The work that needs to be done was always known. It just was not tracked continuously.
The audit preparation cycle is a symptom of a system that is managed to audit dates rather than managed continuously. The same gaps appear before every audit — documents expired, CAPAs not closed, training records incomplete, internal audit programme behind schedule — because the organisation does not have a live view of its audit readiness between audits.
Audit readiness is a continuous state, not an event. Every element that an auditor checks — document validity, CAPA closure, monitoring records, internal audit completion, training records, supplier approval status — has a known deadline or frequency. HublerX tracks every element continuously against the FSSC 22000 and BRC requirements — flagging gaps the moment they arise, not when the audit preparation cycle begins. The audit readiness dashboard shows the live state of the system at any point in the year, not just in the 4 weeks before the auditor arrives.
Live workflow view
The step-by-step sequence
- 1
Audit requirements mapped and tracked
HublerX maintains a live checklist of every audit requirement — document control, CAPA programme, monitoring records, internal audit programme, training records, supplier approval status, and management review schedule — mapped to FSSC 22000 and BRC clauses. Each requirement has a deadline, a responsible owner, and a current status.
Continuous · live view - 2
Document validity tracked and expiry alerts raised
HublerX tracks the validity period of every controlled document — SOPs, quality plans, specifications, supplier approvals, certificates, and regulatory submissions. Expiry alerts are raised 60, 30, and 14 days before the document's review due date. The document owner receives the alert and the document cannot expire without a reviewed-and-approved replacement.
60 · 30 · 14 days before expiry - 3
Open CAPAs tracked against audit requirement
HublerX maintains the CAPA log against the audit programme requirement — the number of CAPAs open, their age, their source, and their effectiveness check status. Where the open CAPA count or age exceeds the threshold that would constitute an audit finding, the quality manager is alerted before the audit, not during it.
Continuous - 4
Monitoring records and internal audit programme tracked
HublerX tracks completion of monitoring records — CCP checks, environmental monitoring, calibration records, and allergen management checks — against the required frequency. The internal audit programme completion is tracked against the annual schedule. Gaps are flagged to the quality team with enough lead time to close them before an audit.
Against scheduled frequency - 5
Training record completeness maintained
HublerX tracks training record completeness — every operator trained to the current SOP revision, food safety training current, allergen awareness training within validity. Where a training record is expiring or an operator has not been trained to a revised SOP, HublerX flags the gap and prompts the training coordinator to schedule the session.
Continuous · by employee - 6
Audit readiness score and evidence pack generated
HublerX generates a live audit readiness score — the percentage of audit requirements currently in a compliant state — and an evidence pack for the auditor on request. The evidence pack includes the CAPA log, the document control register, the monitoring records summary, the internal audit programme completion, and the training matrix — pre-formatted for the auditor.
On demand · always current
Results are directional. Audit readiness score depends on the completeness of quality data in connected systems and the scope of FSSC 22000 or BRC requirements configured.
See how audit readiness automation works in your operation
30 minutes. Your certification scope. Your compliance calendar.