Quality & Compliance

Non-Conformance Resolution

HublerX manages every non-conformance from detection to disposition — routing the NCR to the right reviewer, tracking the investigation timeline, coordinating rework or rejection, and updating the ERP the moment a decision is made.

Non-conformanceNCR managementDispositionFSSC 22000FoodFMCG
The Problem

An NCR is raised on the shopfloor. It sits in a folder until the quality manager finds it.

Non-conformances are raised throughout the manufacturing day — a weight check failure, a seal integrity issue, a label defect, an in-process parameter deviation. Each one needs to be reviewed, investigated, and dispositioned: release, rework, or reject. The decision affects production continuity, material usage, and regulatory compliance.

In most operations, NCRs are raised on paper or in a standalone form and reviewed in the next quality meeting. The batch or product in question sits in limbo — cannot be released without disposition, cannot be reworked without a decision, cannot be rejected without a cost approval. The delay between the NCR being raised and a decision being made is where production bottlenecks and compliance gaps are created.

Current Workaround
What most operations do today: Most operations today: the production operator raises an NCR on a paper form or fills in a QMS entry. The form is reviewed by the line QC technician, who escalates to the quality manager for disposition. The quality manager reviews the NCR in the next daily or weekly quality meeting. If rework is approved, a verbal instruction is given to the shopfloor. If rejection is approved, a write-off form is raised. The ERP is updated manually — sometimes days later. The NCR log in the QMS and the ERP are rarely in sync.
The HublerX Approach

A non-conformance is a decision that needs to be made quickly, by the right person, with the right information. HublerX routes every NCR to the appropriate reviewer based on the product, the failure type, and the severity — immediately on raising. The reviewer sees the NCR details, the affected batch, the production context, and the disposition options in a single screen. The decision is made once and propagates to the ERP, the production team, and the quality record simultaneously.

How It Looks in HublerX

Live workflow view

Non-Conformance Board
9 NCRs active today
UNDER REVIEW3
NCR-2026-0087 · Seal integrityLine 3 · Digestive 100g · WO-5839Under reviewMajor3 packs per case failing seal test · 4 cases
NCR-2026-0085 · Label defectLine 1 · Cream Cracker 200g · WO-5837Under reviewMinorDate print smudged · 600 units · 2 cases
DISPOSITION PENDING2
NCR-2026-0083 · Moisture deviationLine 2 · Marie Light 100g · WO-5833Disposition pendingMajorRoot cause confirmed · Rework vs reject decision
NCR-2026-0081 · Colour out of specLine 3 · Wheat Biscuits 200g · WO-5831Disposition pendingMinorRelease with concession under review
REWORK2
NCR-2026-0079 · Pack weight lowLine 1 · Butter Cookies 200g · Rework approvedReworkRepack WO raised · 1,800 units · In progress
NCR-2026-0077 · Seal failureLine 2 · Oat Cookies 150g · Rework approvedReworkReseal operation · 960 units · 80% complete
CLOSED2
NCR-2026-0075 · Label errorLine 3 · Digestive Mini 50g · ReleasedReleasedConcession approved · ERP updated · Audit trail closed
NCR-2026-0073 · Weight deviationLine 1 · Choco Chip 150g · RejectedRejectedWrite-off ₹28,800 · CAPA triggered · ERP updated
How HublerX Coordinates It

The step-by-step sequence

  1. 1

    Non-conformance detected and logged

    The production operator or QC technician logs the non-conformance in HublerX — failure type, affected batch or WO, quantity, measurement value, and specification limit. Photos or measurement data can be attached. The NCR is timestamped and assigned a reference number automatically.

    On detection · immediate
  2. 2

    Affected product quarantined

    The affected batch or WO quantity is automatically flagged in the WMS for quarantine — preventing it from being picked, dispatched, or used in a downstream process until disposition is confirmed. The quarantine flag is applied in the system without a manual WMS update.

    Immediately on NCR raise
  3. 3

    NCR routed to appropriate reviewer

    HublerX routes the NCR to the appropriate reviewer based on configured rules — minor in-process deviations go to the line QC technician, major failures go to the quality manager, food safety failures go to the food safety team lead. The reviewer receives the NCR with full context and a response deadline.

    Within seconds of NCR raise
  4. 4

    Investigation and disposition decision

    The reviewer investigates the non-conformance and records the root cause in HublerX. The disposition decision — release with concession, rework, or reject — is made in the same interface. For disposition decisions above a configured value threshold, a second approval is required before the decision is executed.

    Within configured response window
  5. 5

    Disposition executed and ERP updated

    The disposition decision is executed in the ERP automatically — released batches have their quarantine flag lifted and become available for picking, rework batches generate a rework work order, rejected batches are written off with the reason code. No separate ERP update by the quality or production team required.

    On disposition approval
  6. 6

    CAPA triggered on repeat or severe NCRs

    Where an NCR is classified as severe or where the same failure type has occurred more than a configured number of times, a CAPA is triggered automatically. The NCR is linked to the CAPA record, and the root cause investigation feeds directly into the CAPA workflow.

    On severity or frequency threshold
Systems Connected
SAPSAP S/4HANA
ORAOracle Cloud ERP
D365Dynamics 365
WMSWMS
SYSQMS (optional)
Outcomes
Automatic
Product quarantined in WMS and NCR routed to reviewer within seconds of detection — no manual routing
Configurable
NCR routing rules by failure type, severity, and product — right reviewer gets the right NCR immediately
One action
Disposition decision propagates to ERP, WMS, production, and logistics simultaneously — no separate updates
Audit ready
Full NCR lifecycle recorded — detection, investigation, disposition, and ERP update — for FSSC 22000 and BRC

Results are directional. Disposition cycle time depends on the complexity of the investigation and the severity of the non-conformance.

Frequently Asked Questions
Related Workflows

See how non-conformance resolution works in your operation

30 minutes. Your quality process. Your compliance requirements.

Map my Quality Execution Gap →
Part of the Manufacturing Execution Gap framework