Quality & Compliance

Quality Hold Management

When a quality hold is raised, HublerX instantly maps every downstream work order, shipment, and customer commitment at risk — and notifies every function simultaneously, without a phone chain.

Quality holdCascade alertingBatch traceabilitySAP QMFoodFMCGChemical
The Problem

A hold is raised in the ERP. Four functions find out four hours later — by phone.

When a QC technician raises a quality hold on a batch, the ERP records it — but the hold sits in isolation. The system has no way to reach production, logistics, and commercial simultaneously. Each function finds out separately: production when a supervisor checks the batch status, logistics when a truck is stopped at the gate, commercial when a customer calls asking where their order is.

By the time all functions are aware, downstream work orders have already run using the affected batch, shipments have been loaded, and customer commitments have been made that can no longer be met. The cost is not just the held batch — it is everything downstream that should have been stopped but wasn't.

Current Workaround
What most operations do today: Most operations today: the QC technician raises the hold in the ERP or QMS and then starts a phone chain — calling the production supervisor, who calls the planner, who calls logistics, who calls the commercial team. Each call takes time. Each handoff risks a gap. By the time the cascade is complete, 3–4 hours have passed. In that window, downstream batches have run, trucks have loaded, and customers have been promised deliveries that are now at risk. The hold record exists in the system. The impact does not.
The HublerX Approach

A quality hold is a single event that needs to reach four functions simultaneously — not sequentially. HublerX reads the hold the moment it is raised, maps the full downstream impact graph in real time — every work order consuming the affected batch, every shipment containing finished goods from that run, every customer commitment at risk — and notifies production, logistics, procurement, and commercial in the same instant. No phone chain. No gap between the hold and the response.

How It Looks in HublerX

Live workflow view

Quality Hold Management
7 active holds
UNDER INVESTIGATION3
Batch VF-0881 — Vegetable FatQH-2026-0087 · Line 1 · FFA out of specOn holdHigh2h ago
Batch SO-0774 — Sunflower OilQH-2026-0085 · Receiving · Supplier certificate missingOn holdMedium4h ago
AWAITING DISPOSITION2
Batch GS-0512 — Glucose SyrupQH-2026-0083 · Line 3 · Lab results receivedPending decisionHighYesterday · 3:20 PM
Batch MP-0339 — Milk PowderQH-2026-0081 · Store · Rework assessment completePending decisionMediumYesterday · 11:00 AM
REWORK IN PROGRESS1
Batch CP-0201 — Cocoa PowderQH-2026-0079 · Line 3 · Re-milling approvedReworkMedium2 days ago
CLOSED3
Batch SA-0119 — SaltQH-2026-0077 · Line 2 · ReleasedReleasedClosed Monday · 4h resolution
Batch WF-1011 — Wheat FlourQH-2026-0075 · Line 1 · RejectedRejectedClosed Monday · Supplier claim raised
Batch PO-0088 — Palm OilQH-2026-0073 · Receiving · ReleasedReleasedClosed Sunday · Certificate received
How HublerX Coordinates It

The step-by-step sequence

  1. 1

    Quality hold raised

    A QC technician raises a hold on a batch — in the ERP, QMS, or directly in HublerX. The hold is timestamped and the cascade triggers immediately. No manual notification required.

    11:04 AM — hold raised
  2. 2

    Downstream impact mapped automatically

    HublerX traces the affected batch through every open work order consuming it, every finished goods batch produced from it, every shipment containing those goods, and every customer commitment linked to those shipments. The full impact graph is rendered in seconds.

    11:04 AM — cascade triggered
  3. 3

    All functions notified simultaneously

    Production receives work order pause instructions. Logistics receives shipment hold flags. Procurement receives supplier escalation context. Commercial receives customer impact summaries. All four notifications are sent at the same moment — not sequentially down a phone chain.

    11:04 AM — all functions notified
  4. 4

    Investigation and disposition coordinated

    The hold record in HublerX tracks the investigation — root cause, samples sent, lab turnaround, and disposition decision. Every action is timestamped and linked to the originating batch. QC, production, and management can see the live status without asking for an update.

    During investigation period
  5. 5

    Disposition decision propagated to ERP

    When the disposition is decided — release, rework, or reject — HublerX pushes the outcome back to the ERP in one action. Released batches resume. Rejected batches are quarantined. Rework instructions are routed to the production team. No manual ERP update required.

    On disposition decision
  6. 6

    Audit trail closed and compliance record generated

    The complete hold lifecycle — raise, cascade, investigation, disposition — is recorded with full timestamps, actor names, and system actions. The audit trail is exportable for FSSC 22000, BRC, and customer compliance submissions without any additional documentation.

    On hold closure
Systems Connected
SAPSAP S/4HANA
ORAOracle Cloud ERP
D365Dynamics 365
SYSQMS (optional)
WMSWMS
Outcomes
0 min
Between hold raised and all functions notified — vs. 3–4 hour phone chain
Full graph
Every affected work order, shipment, and customer commitment mapped automatically
One action
Disposition decision pushed back to ERP — no manual update required
Audit ready
Complete hold lifecycle recorded for FSSC 22000 and BRC without additional documentation

Results are directional. Outcomes vary by ERP and QMS configuration, hold complexity, and organisation structure.

Frequently Asked Questions
Related Workflows

See how quality hold management works in your operation

30 minutes. Your ERP. Your quality process.

Map my Quality Execution Gap →
Part of the Manufacturing Execution Gap framework