The ERP allocates the nearest bin. Not the oldest batch.
Most ERP-driven plants schedule work orders against available stock — not expiry-ordered stock. The system allocates whatever is closest in the warehouse, not whatever expires soonest. Batches with 10 days left on shelf sit untouched while fresh stock is consumed. By the time a planner notices, the near-expiry batch can no longer be used in time.
The result shows up as a write-off line at month end. A percentage of output — typically 0.8–1.2% — quietly written off as near-expiry waste. Planners know it is happening. They run weekly expiry reports, manually cross-reference with the production schedule, and try to catch it before it becomes a problem. Most of the time, they are too late.
FEFO is a constraint, not a report. HublerX reads batch expiry dates continuously from the WMS and ERP, calculates the optimal FEFO consumption sequence for every open work order — factoring in minimum shelf life at shipment (MSLS) requirements — and pushes sequenced pick instructions to the shopfloor before each shift. When a new batch arrives or an expiry date changes, the sequence recalculates automatically. No planner intervention required for routine FEFO compliance.
Live workflow view
The step-by-step sequence
- 1
Batch expiry data ingested continuously
HublerX reads batch expiry dates, quantities, and locations from the WMS and ERP in real time — no manual report extraction or scheduled overnight run. Every new GRN and every batch status change is reflected immediately.
Continuous · on every batch event - 2
FEFO sequence calculated per work order
For each open work order, HublerX identifies which batch should be consumed first based on remaining shelf life and the MSLS requirement for the finished product. Where multiple batches are available, the sequence is ranked automatically.
On schedule refresh · pre-shift - 3
Near-expiry batches flagged for planner review
Batches projected to expire before they can be consumed — given the current production schedule — are surfaced to the planner with a recommended action: expedite into an earlier work order, repurpose to a different SKU, or flag for commercial discount.
When expiry threshold breached - 4
MSLS compliance checked against shipment schedule
For finished goods, HublerX checks that the batch produced from near-expiry inputs will still meet the minimum shelf life requirement at the point of customer delivery. Batches that would fail MSLS are flagged before production runs — not after dispatch.
On work order schedule confirmation - 5
Sequenced pick instructions pushed to shopfloor
Pick instructions are updated in the WMS and on handheld devices before each shift — operators see the correct pallet location and batch ID without any manual intervention from the planner or warehouse supervisor.
Automatic · pre-shift daily - 6
FEFO compliance recorded for audit
Every batch pick is logged against the work order with the FEFO sequence applied, the expiry date consumed, and the MSLS check result. The full audit trail is available for FSSC 22000, BRC, and customer compliance reviews without any manual documentation.
On each batch pick · automatic
Results are directional. Outcomes vary by ERP and WMS configuration, batch volumes, and MSLS requirements by customer.