The promotion is confirmed. 3 weeks later, the production team finds out and has 10 days to build the stock.
Retailer promotions — Diwali feature, summer price promotion, category event, in-store endcap — generate demand spikes that must be anticipated and planned. The FMCG manufacturer commits to a promotional quantity when the trade promotion is agreed with the retailer's buyer. That quantity needs to be on the shelf by the promotion start date — which means it needs to leave the warehouse before that date, which means it needs to be produced before the dispatch window, which means the material needs to be in stock before production starts.
In most FMCG operations, the commercial team confirms the promotion, and the information travels slowly to the supply chain team. By the time the production planner hears about the promotion, the planning window has compressed. The production capacity may not be available on the lines needed. The raw material may not have been ordered. The promotional quantity is built under time pressure, often at overtime cost, and sometimes not fully delivered.
A promotional commitment is a demand signal with a hard delivery deadline. HublerX reads the promotional commitment the moment it is confirmed — by the commercial team in the CRM or TPM system — and immediately calculates the additional production volume required, the production window available, the capacity requirement on the relevant lines, and the incremental material requirement. The supply chain team sees the promotional impact in real time, not in next week's meeting.
Live workflow view
The step-by-step sequence
- 1
Promotional commitment confirmed and loaded
When a promotional commitment is confirmed — in HublerX, the CRM, or the TPM system — HublerX reads the promotional SKU, the promotional quantity, the retailer, the promotion start date, and the agreed dispatch window. The promotional demand is loaded as a fixed constraint separate from the baseline demand forecast.
On commercial confirmation - 2
Promotional uplift volume calculated
HublerX calculates the promotional uplift — the promotional quantity minus the baseline production already planned for the same period. The net additional production requirement is the volume that the production plan must absorb within the promotion's production window.
On commitment load - 3
Production capacity checked against promotion window
HublerX checks the available production capacity on the relevant lines during the promotion's production window against the total demand — baseline plus promotional uplift. Capacity gaps are surfaced immediately: whether the promotional volume can be produced within the available window, which lines can take additional volume, and whether overtime or additional shifts are required.
On uplift calculation - 4
Incremental material requirement calculated
HublerX calculates the incremental raw material and packaging requirement for the promotional uplift — using the BOM — and checks current stock and inbound PO coverage against the additional requirement. Materials that are insufficient to support the promotional volume are flagged for the procurement team to action.
On uplift calculation - 5
Promotional production plan locked
Once the capacity and material plan is confirmed, HublerX locks the promotional work orders into the production schedule — with the promotion reference, the target completion date (accounting for dispatch window and delivery lead time), and the material reservations. The WOs are flagged as promotion-linked and cannot be displaced without a planner override.
On plan confirmation - 6
Promotional stock tracked to dispatch
HublerX tracks the promotional stock from production completion to dispatch — monitoring the finished goods build-up against the promotional commitment, flagging shortfalls in advance of the dispatch window, and confirming the dispatch to the retailer when the promotional quantity leaves the warehouse.
Through dispatch window
Results are directional. Promotional fulfilment depends on capacity availability, material lead times, and the lead time between promotion confirmation and production window.
See how promotional demand planning works in your operation
30 minutes. Your promotional calendar. Your production capacity.