Material Coordination

Purchase Requisition Automation

HublerX generates purchase requisitions automatically from the live MRP position — raising PRs for materials that will fall short of production requirements before the planner has opened the morning report, and routing them for approval without manual intervention.

Purchase requisitionMRP automationProcurementSAPFoodFMCG
The Problem

MRP says raise a PR. The planner raises it two days later — after reviewing the report manually.

MRP output tells planners which materials need to be purchased and when. But the translation from MRP output to a raised purchase requisition is a manual step — the planner reviews the MRP exception report, assesses the requirement, and creates the PR in the ERP one by one. In operations with hundreds of active materials, this process takes hours and is never fully complete before the next MRP run makes the previous output obsolete.

The delay between an MRP gap being identified and a PR being raised is where procurement lead time is consumed. A material with a 5-day supplier lead time that has its PR raised 2 days late arrives 2 days after the production line needs it. The shortage was visible from the day the MRP ran. The response was 2 days slow.

Current Workaround
What most operations do today: Most operations today: the planner runs the MRP exception report each morning, filters for materials below safety stock or with confirmed shortage signals, and manually creates purchase requisitions in SAP for each one — checking the preferred supplier, the lead time, and the required quantity. For operations with 50–200 active raw materials, this process takes 1–3 hours. PRs raised late in the day may not reach the buyer in time for same-day ordering. Materials with longer lead times that are just entering the risk window are often deprioritised until the shortage becomes critical.
The HublerX Approach

A purchase requisition is a calculation — the required quantity minus available stock minus inbound coverage equals the PR quantity, and the required date minus supplier lead time equals the PR date. This calculation runs in seconds and does not require a planner to do it manually for every material every morning. HublerX generates PRs automatically from the live MRP position — raising them the moment a material crosses the configured trigger threshold, routing them to the buyer with the correct preferred supplier and quantity, and escalating overdue approvals without a manual chase.

How It Looks in HublerX

Live workflow view

PR Automation Board
11 PRs tracked today
PR RAISED4
Sunflower Oil — RM-0031PR-2026-2239 · 1,200 L · Adani WilmarAwaiting approvalHighRequired: 21 Jun · Lead time 3 days · Due today
Sugar — RM-0022PR-2026-2237 · 3,200 kg · Rajshri FoodsAwaiting approvalRequired: 23 Jun · Lead time 5 days · Due tomorrow
Cocoa Powder — RM-0078PR-2026-2235 · 800 kg · Barry CallebautAwaiting approvalRequired: 24 Jun · Lead time 7 days · Due today
BUYER REVIEW2
Milk Powder — RM-0067PR-2026-2233 · 960 kg · AmulUnder reviewHighNeha P reviewing · Price variance flagged
Palm Oil — RM-0041PR-2026-2231 · 2,400 L · ITCUnder reviewNeha P reviewing · Quantity adjustment
ESCALATED1
CONVERTED TO PO4
Salt — RM-0009PO-9031 raised · 1,600 kg · Tata ChemicalsPO raisedCoverage confirmed · WO-4441 protected
Butter — RM-0051PO-9029 raised · 480 kg · AmulPO raisedCoverage confirmed · WO-4443 protected
Oat Flour — RM-0094PO-9027 raised · 320 kg · PatanjaliPO raisedCoverage confirmed · WO-4445 protected
Corn Starch — RM-0061PO-9025 raised · 800 kg · RoquettePO raisedCoverage confirmed · WO-4447 protected
How HublerX Coordinates It

The step-by-step sequence

  1. 1

    Live MRP position monitored continuously

    HublerX maintains a live material requirements position — demand from confirmed work orders, available stock, and inbound PO coverage — updated whenever any input changes. PR trigger thresholds are evaluated continuously against this position, not once at the end of an overnight batch run.

    Continuous · real time
  2. 2

    PR trigger threshold breached

    When a material's projected stock position falls below the configured PR trigger threshold — typically safety stock plus the quantity needed to cover the production plan through the supplier lead time — HublerX identifies the required PR quantity, the required delivery date, and the preferred supplier from the ERP vendor master.

    On threshold breach · real time
  3. 3

    Purchase requisition generated automatically

    HublerX creates the purchase requisition in the ERP automatically — with the correct material code, quantity, required delivery date, preferred supplier, and cost centre. The PR is created as a draft pending buyer review, not submitted directly to the supplier.

    Immediately on threshold breach
  4. 4

    Buyer notified for review and approval

    The responsible buyer receives the PR notification with the material, quantity, supplier, required date, and the MRP signal that triggered it — so the buyer understands why the PR was raised and can confirm or adjust before converting to a PO. PRs above a configured value threshold require a second approval.

    On PR creation
  5. 5

    Overdue PRs escalated automatically

    Where a PR has not been approved or converted to a PO within the configured time window — accounting for the supplier lead time and the production requirement date — HublerX escalates the overdue PR to the procurement manager with the number of days remaining before the production shortage becomes critical.

    On approval deadline breach
  6. 6

    PR converted to PO and coverage confirmed

    When the buyer approves the PR and converts it to a PO, HublerX updates the material coverage position in the live MRP — the projected stock now reflects the inbound PO. If the PO covers the requirement, the shortage alert is closed. If a partial PO is raised, the remaining gap stays open.

    On PO creation
Systems Connected
SAPSAP S/4HANA
ORAOracle Cloud ERP
D365Dynamics 365
TALTally
SYSSupplier portal (optional)
Outcomes
Automatic
Purchase requisitions generated from live MRP position — no manual planner review of exception report required
Real time
PR triggered the moment material coverage falls below the threshold — not the next morning after an overnight run
Escalated
Overdue PRs escalated to procurement manager automatically — with production impact and days to critical clearly stated
Hours saved
Planner time freed from manual MRP-to-PR translation — focused on exceptions that require judgment

Results are directional. PR automation effectiveness depends on MRP data quality, vendor master completeness, and buyer approval responsiveness.

Frequently Asked Questions
Related Workflows

See how PR automation works in your operation

30 minutes. Your ERP. Your material planning process.

Map my Material Planning Gap →