The institutional buyer sends an RFQ on Monday. The response is ready Thursday. They've already placed the order elsewhere.
Responding to a B2B or institutional RFQ in food and FMCG requires data from at least three functions: the sales team needs the price (commercial), the planner needs to confirm capacity and lead time (production), and procurement needs to confirm raw material availability (supply chain). In most operations, assembling that data is a sequential, manual process — the salesperson emails the planner, the planner checks the ERP and replies, the salesperson emails procurement, procurement checks stocks and replies. The full loop takes 24–72 hours.
In competitive RFQ situations — government tenders, large institutional buyers, export inquiries — response speed is a direct input to win probability. A buyer who receives a qualified response in 4 hours and a competitor response in 4 hours will choose on price. A buyer who receives the competitor response in 4 hours and the manufacturer's response 2 days later has often already moved. The information needed to respond was available in the ERP and the production plan; the delay was the time to assemble it.
An RFQ response requires four inputs — available capacity, material availability, lead time, and price — all of which are in the ERP and the production plan. HublerX pulls those inputs automatically when an RFQ is logged, generates a draft response with the confirmed figures, and routes it to the commercial director for review and approval. The sales team sends a qualified response in hours, not days. The capacity and material commitment in the response is based on real data, not an estimate.
Live workflow view
The step-by-step sequence
- 1
RFQ logged in HublerX
When an RFQ is received — by email, portal, or phone — the sales coordinator logs it in HublerX: customer, SKU or product specification, quantity, required delivery date, and any quality or certification requirements. The RFQ is immediately visible to the planning, procurement, and commercial teams.
On RFQ receipt - 2
Capacity availability checked
HublerX checks the production schedule for available capacity against the RFQ quantity and required delivery date. For standard SKUs, the check is immediate — line loading, existing work orders, and available shift capacity are read from the ERP or production plan. For custom formulations, a feasibility estimate is generated based on comparable products.
On RFQ logging · automatic - 3
Material availability confirmed
HublerX checks raw material stock and inbound PO positions for the materials required to produce the RFQ quantity. Where stock and committed inbound purchases can cover the requirement, materials are flagged as available. Where additional procurement is needed, the lead time and approximate cost impact are estimated.
Simultaneously with capacity check - 4
Lead time and delivery date calculated
HublerX calculates the earliest confirmed production start date (based on material availability and capacity), the production duration (based on quantity and line rate), and the earliest delivery date. Where the customer's required date cannot be met, the earliest achievable date is surfaced alongside the gap.
On capacity and material confirmation - 5
Draft quote assembled and routed for approval
HublerX generates a draft RFQ response: confirmed quantity, price (from the applicable customer or channel pricing scheme), earliest delivery date, validity period, and quality or certification details. The draft is routed to the commercial director for review — with the underlying capacity and material data visible for verification.
On data assembly completion - 6
Quote approved and sent · Follow-up tracked
Once approved, the quote is sent from HublerX with a validity date. The follow-up timeline is tracked — when the response is due, when the customer should be chased, and what the outcome was (won, lost, no decision). Won RFQs convert to confirmed sales orders; the capacity and material reservation confirmed in the quote flows through to the production plan.
On commercial approval
Results are directional. Response time improvement depends on ERP data quality, product complexity, and approval workflow configuration.
See how RFQ response works in your operation
30 minutes. Your next tender. Your capacity data.