Material Coordination

Critical Raw Material Monitoring

HublerX monitors every critical raw material in real time — calculating days-of-coverage against the live production plan, tracking inbound PO status against required arrival dates, and surfacing risk before the production line stops.

Critical materialsDays of coverageShortage preventionFoodFMCG
The Problem

A critical material runs out on a Tuesday. The warning was visible on Monday. Nobody was looking.

Every manufacturing operation has a set of raw materials where a shortage immediately stops production on its highest-revenue SKUs. These materials — a key grain, a key fat, a specific packaging component, a key automotive fastener — are known and finite. The information needed to monitor them — current stock, inbound PO status, daily consumption, production plan — exists in the ERP. But it is not assembled and surfaced continuously in a form that allows the planning team to act before a shortage occurs.

Critical material monitoring fails not because of a data problem but because of a process problem: the MRP runs overnight, the exception report is reviewed the next morning, the planner is dealing with the most urgent issue on the list, and the critical material with 3 days of coverage does not get the attention it needs until it has 1 day of coverage and the options have narrowed significantly.

Current Workaround
What most operations do today: Most operations today: the planning team maintains a 'watch list' of critical materials — a spreadsheet updated manually every morning from ERP stock reports. The planner calculates the days of coverage for each material by dividing the current stock by the daily consumption. Inbound PO status is checked separately. The watch list is reviewed in the morning planning meeting. Coverage calculations done manually are prone to error and do not reflect intra-day stock movements. Materials that slip off the watch list because they look fine on Monday can become critical by Wednesday.
The HublerX Approach

Critical material monitoring is a real-time calculation problem — current stock minus daily consumption from confirmed WOs gives days of coverage, and this number changes every time a WO is issued, a GRN is received, or a production order is completed. HublerX maintains this calculation in real time for every critical material — updating coverage the moment any input changes, tracking each inbound PO's expected arrival date against the coverage timeline, and surfacing risk at the right threshold with the right context for the planner to act.

How It Looks in HublerX

Live workflow view

Critical Material Monitor
12 critical materials tracked
RED · ≤3 DAYS2
Glucose Syrup — RM-00551.8 days · Tate & Lyle ETA uncertainCriticalEscalatedWO-4458 at risk tomorrow · Alternate sourcing active
AMBER · 4–7 DAYS3
Sunflower Oil — RM-00316.2 days · PO-9031 arriving FridayWatchMonitorPO confirmed · Coverage restored if on time
Milk Powder — RM-00675.1 days · Amul PO unconfirmedWatchChase POPO-9033 sent · No Amul confirmation · Neha P chasing
Cocoa Butter — RM-00794.8 days · Barry Callebaut PO confirmedWatchPO confirmed ETA Thursday · Coverage OK if on time
GREEN · 8+ DAYS6
Sugar — RM-002212.4 days · 2 POs inboundSecurePO-9041 · PO-9039 · Both confirmed
Palm Oil — RM-00419.8 days · ITC PO confirmedSecurePO-9037 ETA Monday · Coverage 16 days post-arrival
Salt — RM-000918.2 days · In stockSecureNo open PO needed · Safety stock exceeded
Oat Flour — RM-009411.1 days · Patanjali PO confirmedSecurePO-9035 ETA Wednesday
Corn Starch — RM-00618.4 days · Roquette PO in transitSecurePO-9043 GRN expected tomorrow
Baking Powder — RM-009714.6 days · In stockSecureNo action needed · Next PO due next month
ALERTS RESOLVED TODAY1
Butter — RM-0051Was 2.4 days · Amul GRN receivedResolved480 kg received · Coverage now 9.1 days · Alert closed
How HublerX Coordinates It

The step-by-step sequence

  1. 1

    Critical material list defined and monitored

    The planning team defines the critical material list in HublerX — the raw materials where a shortage would stop production on key SKUs. Each material is configured with its coverage thresholds — green, amber, and red — and the responsible planner and buyer.

    Configuration · reviewed monthly
  2. 2

    Days-of-coverage calculated in real time

    HublerX calculates days-of-coverage for each critical material continuously — current stock (less any quality holds) divided by the daily consumption from confirmed work orders on the live production plan. The calculation updates every time a WO is issued, a GRN is received, or a production order is completed.

    Continuous · real time
  3. 3

    Inbound PO status tracked against coverage

    For each critical material, HublerX tracks every open inbound PO — the expected delivery date, the quantity, and the supplier confirmation status. The coverage timeline shows whether the inbound POs will arrive before the current stock runs out. Where a PO is late or unconfirmed, the coverage timeline is marked as at risk.

    Continuous · real time
  4. 4

    Amber alert — planner notified to act

    When a critical material's days-of-coverage falls below the amber threshold — typically 7–10 days — HublerX sends an alert to the responsible planner with the current coverage, the production WOs at risk if the material runs out, and the status of open inbound POs. The planner reviews and takes action — expedite the PO, raise a new PR, or activate alternate sourcing.

    On amber threshold breach
  5. 5

    Red alert — escalated to management

    When coverage falls below the red threshold — typically 3 days — HublerX escalates to the procurement manager and plant manager simultaneously, with the specific WOs that will stop and the time remaining to prevent it. Every available option — emergency PO, inter-plant transfer, alternate material substitution — is surfaced in the alert.

    On red threshold breach
  6. 6

    Coverage restored and alert closed

    When the coverage is restored — by a GRN, a confirmed PO ETA, or an inter-plant transfer — the alert is closed and the coverage timeline returns to green. The action taken, the time from alert to resolution, and the production impact (if any) are recorded in the monitoring log for the monthly supply chain review.

    On coverage restoration
Systems Connected
SAPSAP S/4HANA
ORAOracle Cloud ERP
D365Dynamics 365
TALTally
WMSWMS
Outcomes
Real time
Days-of-coverage recalculated every time stock, GRN, or WO changes — not every morning from a batch report
Two thresholds
Amber alert at 7 days — planner acts. Red alert at 3 days — management escalated. Different urgency, different response.
PO-aware
Coverage calculation accounts for confirmed inbound POs — alerts distinguish between uncovered shortage and delayed PO
All options
Red alert surfaces all available responses — expedite PO, inter-plant transfer, alternate material — not just a flag

Results are directional. Effectiveness depends on ERP data quality, WO confirmation discipline, and supplier PO confirmation responsiveness.

Frequently Asked Questions
Related Workflows